Skip to content
Summary
- Construction of a new greenfield Bioethanol & Cogeneration Plant at Makeni for Addax Bioenergy
- Country: SIERRA LEONE
- Contract Period: 2011-2014
- Basic Engineering: 6 months
- Piping Design: 6 months
- Supply of Equipment: 12 months
Basic Engineering
- Process design for Juice Extraction, Purification and Evaporation
- Management of equipment list
- Specifications for purchase of equipment
- Specifications for purchase of piping, valves and fittings
Plant Layout
- Layout drawings for Juice Extraction, Purification and Evaporation
- Layout drawings for Utilities
- Structural Guide Drawings for equipment supporting steelwork and platforms
- Updating of layout drawings with information from suppliers
P&ID’s
- P&ID’s for Juice Extraction, Purification and Evaporation
- P&ID’s for Utilities
- Updating of P&ID’s with information from suppliers
Piping Design
- 3D Plant model and pipe routing for the Juice Purification and Evaporation
- Isometric drawings for all Juice Purification and Evaporation piping
Equipment Supply
- 1 Heavy Duty Whole Stick Cane Shredder
- 6 Juice Heaters
- 5 Kestner Evaporators
- 2 Robert Evaporators
- 1 Juice Clarifier & 1 Flash Tank
- 3 Condensate Receivers
- 2 Condensers
- 1 Syrup Cooler
Copyright © 2016 Emineo. All Rights Reserved.
Emineo Ltd - Highlands, Phoenix, Mauritius - Tel: +230 6988200