ACTOM PROJECT – 80TPH BOILER ERECTION

Summary

  • Year: 2015 – 2016
  • Client: Kwilu Ngongo Sugar Company
  • Country: Democratic Republic of Congo
  • Description: Installation of an 80 tph John Thompson Boiler
  • Capacity: 80 tph@ 30bar, 385°C

Structural Installation

  • Boiler Structure
  • Air heater structure
  • Checkered plate & grating
  • Sheeting

Mechanical Installation

  • Pressure parts
  • Pinhole grate
  • Fuel firing equipment
  • Airheater
  • Scrubber
  • Chimney stack
  • Equipment & valves
  • Refractories & insulation
  • Ducting, casings, hoppers

Piping Installation

  • Low pressure
  • High pressure
  • Valves and accessories

Electrical Installation

  • MCC room
  • Electrical Panels
  • MV cabling
  • LV cabling
  • Motors wiring

Instrumentation & Control

  • Control panels
  • Instruments
  • Control cabling
  • Instrument testing & calibration